Project
Name |
| |
|
UNC-W Privatized Student Housing |
|
| |
Location |
| |
|
Wilmington, NC |
|
| |
Description: Phase One - Seahawk Village |
| |
- |
6 residential buildings and a clubhouse |
| |
- |
212,000 sq. ft. |
| |
- |
522 beds |
| |
- |
Provided over 5000 feet of concrete encased telecommunications ductbank from the existing campus headend to the clubhouse. The clubhouse acts as a new distribution point for the back of the campus. |
| |
- |
Provided 1200 feet of concrete encased high voltage ductbank and 1500 feet of concrete encased medium voltage ductbank. This was added to provide a new power distribution from the existing campus high voltage system to the new student housing project. |
| |
- |
Provided a new 6-way voltage switch, two 1500kva pad mount utility transformers and a 300kva pad mount utility transformer. |
| |
- |
Provided a 125kw diesel generator |
| |
|
|
| |
Description: Phase Two - Seahawk Landing |
| |
- |
7 residential buildings with coffee shop, convenience store, office area, mail room and fitness center. |
| |
- |
1 pool house |
| |
- |
256,000 sq. ft. |
| |
- |
609 beds |
| |
- |
Provided over 2750 feet of concrete encased telecommunications ductbank from the existing campus headend to the clubhouse. The clubhouse acts as a new distribution point for the back of the campus. |
| |
- |
Provided 650 feet of concrete encased high voltage ductbank and 3000 feet of concrete encased medium voltage ductbank. This was added to provide a new power distribution from the existing campus high voltage system to the new student housing project. |
| |
- |
Provided two 1500kva pad mount utility transformers |
| |
- |
Provided a 130kw diesel generator |
| |
| |